.jpg)
CTLINK Intergral Grommet
Integral Brush Grommet
Designed to seal openings in newly raised floor cutouts before the installation of communications or power cabling. Based on measurements at multiple data centers, on average 48% of valuable conditioned air is not reaching the air intake of IT equipment due to unsealed floor openings. This lost air, known as bypass airflow, contributes to IT equipment hot spots, cooling unit inefficiencies, and increasing infrastructure costs. KoldLok® products specifically address bypass airflow and its detrimental effects on data center cooling.
Part Number
Ctlink Integral Brush grommet
Color
Technical specifications
CTLINK Integral Brush Grommet
Designed to seal openings in newly raised floor cutouts before the installation of communications or power cabling. Based on measurements at multiple data centers, on average 48% of valuable conditioned air is not reaching the air intake of IT equipment due to unsealed floor openings. This lost air, known as bypass airflow, contributes to IT equipment hot spots, cooling unit inefficiencies, and increasing infrastructure costs. KoldLok® products specifically address bypass airflow and its detrimental effects on data center cooling.
Part Number
Ctlink Integral Brush grommet
Description:
The grommet is made of stainless steel /aluminum alloy/plastic , Our main sizes are 175x175mmm, 200x200mm,260x200mm.The size can be cusomized.
Feature:
1.Prevents the loss of cold air through cable opening in access floor tiles
2.Easy installation in new tile cuts or over existing holes.
3.Forms a tight air seal around cables
4.Durable sealing materials will not break, stretch,tear or deform from repeated use.
5.Four types avaiable.
-Integral Gromments for new installations
-Surface-Mount Grommets to cover existing holes
-Extended brush grommets to cover large narrow opeings.
-Square Brush grommets or Round brush grommet openings.
Download Document
Product videos
Integral Brush Grommet
Designed to seal openings in newly raised floor cutouts before the installation of communications or power cabling. Based on measurements at multiple data centers, on average 48% of valuable conditioned air is not reaching the air intake of IT equipment due to unsealed floor openings. This lost air, known as bypass airflow, contributes to IT equipment hot spots, cooling unit inefficiencies, and increasing infrastructure costs. KoldLok® products specifically address bypass airflow and its detrimental effects on data center cooling.
Part Number
Ctlink Integral Brush grommet